Nuovo supporto per Ancillaries a GASP
A simple structure made in Bosch Aluminum Structural Framing
(see also here) |
||||||||||
Distance from the CF100 flange and the target position is 1315 mm Lenght of the last piece of pipe including the below (this piece can be removed) = 268 mm |
||||||||||
|
||||||||||
If you have problems with the drawing resolution, please open the pdf files |
Progetto e realizzazione: Servizio Tecnologie meccaniche e dei materiali dei LNL